Conference
Center
![]()
Engineering Building
Engineering Office Master
Plan
Erythorbic Control Room
Firemains Back Flow Prevention Building
(Building 58
Firemains Back Flow Prevention
Building
(Building 151-A)
![]()
Main Gate and Administration Building
![]()
Master Plan
Master Plan 2006
Master Plan 2006 Implementation
Organic Control Room.
Organic Synthesis Plant (Design Consultation)
Organic Synthesis Plant
Feasibility Study
Plant Cafeteria
Plant Exterior Painting Scheme
Plant Infrastructure Design Standards
Plant Precast Structures
Design Standards
Process Areas Painting Scheme
South Gate Employee Parking
Stockroom and Warehouse Loading Dock
Waste Water Treatment
Facility
(Design Consultation)
Waste Water Treatment Facility Site Improvements
Groton, Connecticut